CoastTec

  • 410.521.1000
  • Customer Login
  • View Cart
  • Home
  • Shop
    • Back UPS Pro
    • Back UPS
    • Smart UPS
      • Rackmount
      • Tower
      • XL
    • Smart UPS RT
    • Network Management Cards
    • Batteries
      • XR Battery Packs
      • RBC Compatible Battery Kits
      • Single Batteries
  • Service
    • Advanced-Exchange
    • Repair and Return
    • Reconditioning Process
      • 30-Step Recertification Process
    • CoastTec Warranty
  • FLEET MANAGEMENT
    • Lifecycle of a UPS
    • Comprehensive Protection Plan
  • SUSTAINABILITY
    • R2 Certification
    • E-Waste
    • Recycle Your UPS
    • Corporate Responsibility
  • SUPPORT
    • Troubleshooting
    • Contact Our Support
  • ABOUT US
    • What We Do
    • Contact Us
    • News
  • EMPLOYMENT OPPORTUNITIES
    • Current Openings
    • How to Apply
    • Equal Opportunity Employer

30-Step Recertification Process

Choose control and confidence.

Using the following rigorous 30-Step Recertification Process, our APC-Certified Repair Technicians expertly recondition every UPS, giving you peace of mind that your unit is in peak condition and that your data will be protected.

  1. Replace batteries
  2. Inspect the unit for any component damage or excessive heat markings
  3. Replace any missing parts
  4. Verify charging circuit
  5. Adjust the charging circuit
  6. Check APC database for any engineering change orders
  7. Fix any cold solder joints or loose components
  8. Tighten all Fast-on connectors
  9. Check Earth leakage
  10. Adjust AC Line Constant to insure proper reading of the incoming AC Line
  11. Adjust all 4 Battery Constants
  12. Adjust Power Constant
  13. Perform Lights test
  14. Verify Firmware version and flash EPROM with new version or replace Microprocessor with new version
  15. Verify and adjust I/O constant
  16. Verify and reset UPS Identity code
  17. Reset Battery change date
  18. Verify the waveform of the output on the oscilloscope
  19. Verify transfer point to boost function
  20. Turn down input voltage farther to verify transfer point to full battery
  21. Turn up input voltage to verify transfer point to trim function
  22. Turn up input voltage further to verify transfer point to high voltage battery
  23. Adjust any transfer point as needed
  24. Load unit to 100% load and cut input power to insure load stays up and waveform is stable
  25. Verify all push buttons are functioning properly
  26. Verify all Bezels are properly attached and replace if necessary
  27. Verify integrity of all mounting brackets, if applicable
  28. Re-paint or replace covers
  29. Inspect to insure all screws are properly installed and properly torqued
  30. Clean entire unit
30-steps-pic1

30-steps-pic2

30-steps-pic3b-300x300

Service

  • Overview
  • Advanced-Exchange
  • Repair and Return
  • Reconditioning Process
  • CoastTec Warranty
GET A FREE QUOTE TODAY
1to2yrs-warranty

News

We’re a Company on the Move!

Is Your Closet Hurting Your UPS?

What’s El Niño Got to Do With It?

Get In Touch

1533 Progress Way Suite 113 . Eldersburg, MD 21784 info@coasttec.com . 410-521-1000
  • LinkedIn
  • YouTube
  • HOME
    • Login
    • Partner Downloads
    • Terms and Conditions of Sale and Policies
    • CoastTec Warranty
    • Sitemap
  • SHOP
    • Back UPS Pro
    • Back UPS
    • XR Battery Packs
    • Smart-UPS
    • Smart – UPS Online (RT)
    • Network Management Cards
  • Service
    • Advanced-Exchange
    • Repair and Return
    • Reconditioning Process
    • CoastTec Warranty
  • FLEET MANAGEMENT
    • Lifecycle of a UPS
    • Comprehensive Protection Plan
  • SUSTAINABILITY
    • R2 Certification
    • E-Waste
    • Corporate Responsibility
  • SUPPORT
    • Troubleshooting
    • Contact Our Support
  • ABOUT US
    • What We Do
    • Contact Us
    • News
CoastTec is the only APC-certified out-of-warranty service center for single-phase APC UPS and only R2V3 and RIOS certified company specializing in reuse and remanufacturing of APC UPS equipment.
R2 RIOS